Applied research for creating a cost-effective interchangeable 3D spatial data infrastructure with survey-grade accuracy

Project code LEP19022
Start date April 1, 2019
End date March 31, 2021
Project category Research
Lead Andri Riid
Personnel Aleksei Tepljakov
Other personnel Rene Pihlak, Roland Lõuk, Kayode Hadilou Adje, Toghrul Aghakishiyev, Sergei Astapov
Partners EyeVi Technologies
Funding Smart specialisation (NSP)
Project link https://www.etis.ee/Portal/Projects/Display/e344ff8c-ce7d-4b03-8db0-ed85cb4a8170?lang=ENG

The current research main target is to impact the whole spatial data management process by producing the next level 3D spatial base data layer and integrating it with widely used existing spatial databases. To be able to look the process as a whole the research will include the full process of the spatial data management–from the data generation to the spatial data infrastructure platform. One of the key elements is to understand the effect of implementing AI based automated information detection in every process to reduce the costs and maximize the efficiency and therefore reduce the time spent on data generation process.

Project publications

Share this